Guidelines on field measurement procedures for quantifying catchment sediment yields.

Lawrence, P. (1996) Guidelines on field measurement procedures for quantifying catchment sediment yields. Project Report. HR Wallingford Ltd.

[img] PDF
ODTN77.pdf
Available under License Creative Commons Attribution.

Download (5MB)

Abstract

Most of the logistical problems associated with river sediment sampling canbe avoided when data derived from reservoir surveys are used to estimate sediment yields. However there are some difficulties in deriving sediment yields from reservoir volume changes: estimating the reservoir sediment trap efficiency, and the density of the sediment deposits. Means of determining these parameters and recommended procedures for establishin reservoir volume changes from survey date are described. This report describes work funded by the ODA under the TDR programme (TDR Project R5836).

Item Type: Monograph (Project Report)
Subjects: Water > General
Divisions: Water
Depositing User: Unnamed user with email i.services@hrwallingford.com
Date Deposited: 02 Apr 2020 09:44
Last Modified: 02 Apr 2020 09:44
URI: http://eprints.hrwallingford.com/id/eprint/375

Actions (for site administrators only - login required)

View Item View Item