Sludge disposal in Liverpool Bay - twelfth bed monitoring survey, December 1984 - March 1985

Kiff, P. (1986) Sludge disposal in Liverpool Bay - twelfth bed monitoring survey, December 1984 - March 1985. Technical Report. Hydraulics Research Wallingford.

Abstract

This report describes the twelfth survey carried out in December 1984 and March 1985 continuing the long term monitoring of the bed sediments of Liverpool Bay. The objective of the programme is to determine whether any changes are occurring in the surface sediment characteristics as a consequence of changes in the rate of sewage sludge disposal since 1972.

Documents
111:107
[thumbnail of SR71.pdf]
Preview
SR71.pdf

Download (8MB) | Preview
Information
Authors:
Library
Statistics

Downloads

Downloads per month over past year

View Item