Kellagher, R. (2005) Preliminary rainfall runoff management for developments - R&D Technical Report W5-074/A/TR/1. Technical Report. Environment Agency/DEFRA.
PDF
Flood_Risk_User_Guide_Rev_D_App_1_Fig_6.1.pdf Download (1MB) |
|
PDF
Flood_Risk_User_Guide_-EA-Defra_format-Rev_D-07_09_05_-_COMPLETE.pdf Download (19MB) |
|
PDF
Flood_Risk_User_Guide_Rev_D_App_1_Fig_1-3.pdf Download (345kB) |
|
PDF
Flood_Risk_User_Guide_Rev_D_App_1_Fig_4-5.pdf Download (616kB) |
|
PDF
Flood_Risk_User_Guide_Rev_D_App_1_Fig_6.2.pdf Download (1MB) |
|
PDF
Flood_Risk_User_Guide_Rev_D_App_1_Fig_6.3.pdf Download (1MB) |
|
PDF
Flood_Risk_User_Guide_Rev_D_App_1_Fig_7-12.pdf Download (505kB) |
Abstract
This Guide is aimed at Regulators, Developers and Local Authorities to advise on the management of stormwater drainage for developments and in particular to assist in sizing of storage elements for the control and treatment of stormwater runoff. It is based on the requirements of the Interim Procedure produced by the Environment Agency which is reproduced in this document following on from this summary. This Guide may be used to form part of a Flood Risk Assessment to comply with PPS25, but it does not address issues such as risk of flooding from a watercourse, effects of changes in floodplain storage or in floodplain conveyance.
Item Type: | Monograph (Technical Report) |
---|---|
Additional Information: | Document available on this website as agreed by the Environment Agency/DEFRA. |
Divisions: | Floods |
Depositing User: | Unnamed user with email i.services@hrwallingford.com |
Date Deposited: | 02 Apr 2020 09:47 |
Last Modified: | 18 May 2020 14:45 |
URI: | http://eprints.hrwallingford.com/id/eprint/549 |
Actions (for site administrators only - login required)
View Item |