Gouldby, B.P. (2012) Briefing: Reliability and optimised maintenance for sea defences. Proceedings of the Institution of Civil Engineers - Maritime Engineering, 165 (2). pp. 49-50.
Full text not available from this repository.
Official URL: http://www.icevirtuallibrary.com/content/article/1...
Abstract
This briefing article aims to provide a broader, explanatory commentary for non-specialists on the paper that follows in this issue on optimum repair intervals for sea defences.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | floods & floodworks; maintenance & inspection; coastal engineering |
Subjects: | Floods > General |
Depositing User: | Unnamed user with email i.services@hrwallingford.com |
Date Deposited: | 02 Apr 2020 09:50 |
Last Modified: | 29 May 2020 14:33 |
URI: | http://eprints.hrwallingford.com/id/eprint/883 |
Actions (for site administrators only - login required)
View Item |