Sludge disposal in Liverpool Bay - fifteenth bed monitoring survey, February 1988

Kiff, P. and Crickmore, M. (1989) Sludge disposal in Liverpool Bay - fifteenth bed monitoring survey, February 1988. Technical Report. Hydraulics Research Wallingford.

Abstract

This report describes the fifteenth HR survey carried out in February 1988, continuing the long-term monitoring of the bed sediments of Liverpool Bay. The objective is to determine whether an any changes are occurring in the abundance of heavy metals and of organic matter in the finer fraction of the bed sediment as a consequence of sewage sludge disposal. The differences in measured concentration arising from the selection of 90µm instead of the more traditional 63µm as the upper limit of the finer fraction is germane to the future conduct of the monitoring programme by the North West Water Authority. The findings of the second half this two-year study into the expected consequences of making this choice are described.

Documents
229:225
[thumbnail of SR196.pdf]
Preview
SR196.pdf

Download (17MB) | Preview
Information
Authors:
Library
Statistics

Downloads

Downloads per month over past year

View Item