Up a level |
Gouldby, B.P. and Lhomme, J. and McGahey, C. and Panzeri, M. and Hassan, M. and Kakeh Burgada, N. and MagaƱa Orue, C. and Jamieson, S. and Wright, G. and van Damme, M. and Morris, M. (2012) A flood system risk analysis model with dynamic sub-element 2D inundation model, dynamic breach growth and life-loss. In: FLOODrisk 2012, 20-22 November 2012, Rotterdam.
Sayers, P. and Rushworth, A. and Wallerstein, N. and Arthur, S. and Simm, J.D. and Morris, M. and van Damme, M. and Roca, M. and Wallis, M. and Long, G. and Mawdesley, M. and Smith, M. and Taha, A. and Roca, M. and McGahey, C. and Stripling, S. and Gouldby, B.P. and Woodward, M. and Simm, J.D. and Flikweert, J. and Sayers, P. (2011) FRMRC presentations to practitioners workshop. In: FRMRC Practitioner workshop on asset management, 4 October 2011, School of Oriental & African Studies, London, UK. (Unpublished)
O'Hare, M. and Clarke, R. and Bowes, M. and Cailes, C. and Henville, P. and Bissett, N. and McGahey, C. and Neal, M. (2010) Eutrophication impacts on a river macrophyte. Aquatic Botany, 92 (3). pp. 173-178.
McGahey, C. and Knight, D. and Samuels, P.G. (2009) Advice, methods and tools for estimating channel roughness. Proceedings of the Institution of Civil Engineers - Water Management, 162.
McGahey, C. and Samuels, P.G. and Knight, D. and O'Hare, M. (2008) Estimating river flow capacity in practice. Journal of Flood Risk Management, 1 (1). pp. 23-33.
McGahey, C. and Ramsbottom, D. and Panzeri, M. and Millington, R. (2005) National flood hazard mapping for Scotland - an innovative approach. In: Defra Flood and Coastal Management Conference 2005, 5 - 7 July 2005, York, UK.
McGahey, C. and Samuels, P.G. (2004) A practical approach to uncertainty in conveyance estimation. In: Annual Conference of River and Coastal Engineers 2004, June 2004, University of York, UK.