Up a level |
Roca, M. and Bettess, R. (2009) Is steady sediment transport possible in graded sediments? In: RCEM 2009 (6th IAHR Symposium on River, Coastal and Estuarine Morphodynamics), 21-25 September 2009, Santa Fe, Argentina.
Bain, V. and Bettess, R. and Hardwick, M. and Vernon, S. (2006) Challenges in meeting the WFD and achieving sustainable flood risk management in urban rivers. In: 41st Defra Flood and Coastal Management Conference, 4 - 6 July 2006, York, UK.
Fenn, C.R. and Bettess, R. and Golding, B. and Farquharson, F.A. and Wood, T. (2005) The Boscastle flood of 16 August 2004: Characteristics, causes and consequences. In: Defra Flood and Coastal Management Conference 2005, 5 - 7 July 2005, York, UK.
Bettess, R. (2005) Flooding in Boscastle and North Cornwall, August 2004. Project Report. HR Wallingford Ltd.
Bettess, R. and Bain, V. (2005) Urban River Basin Enhancement Methods - Decision Support Framework for Assessing and Managing Urban River Rehabilitation - Work Packages 5 & 9. Project Report. HR Wallingford Ltd.
Bettess, R. and Fisher, K. (1998) Lessons to learn from the UK River Restoration projects. Ribamod- River Basin modelling, management and flood mitigation conceted action. pp. 185-198. ISSN 92-828-7110-X
Bettess, R. and Reeve, C. (1995) Performance of river flood embankments. Technical Report. HR Wallingford.
Bettess, R. and Watts, J. (1992) Unsteady flow and fluid transients. Technical Report. Taylor and Francis.
Bettess, R. (1991) Alluvial friction in the transition zone. Technical Report. HR Wallingford.
Shiqiang, W. and White, W.R. and Bettess, R. (1986) Experiments on alluvial friction. Technical Report. Hydraulics Research Wallingford.
White, W.R. and Bettess, R. (1986) A study on river regime. Technical Report. Hydraulics Research Wallingford.
White, W.R. and Paris, E. and Bettess, R. (1981) Tables for the design of stable alluvial channels. Technical Report. HR Wallingford Ltd, Wallingford.