Up a level |
Samuels, P.G. and Morris, M. and Sayers, P. and Creutin, J. and Kortenhaus, A. and Klijn, F. and Mosselman, E. and Van Os, A. and Schanze, J. (2008) Advances in flood risk management from the FLOODsite project. In: FLOODrisk 2008, 30 September - 2 October 2008, Keble College, Oxford, UK.
Rossetto, T. and Allsop, W. and Robinson, D. and Charvet, I. and Bazin, P. (2008) Analysis of tsunami hazards by modelling tsunami wave effects. In: FLOODrisk 2008, 30 September - 2 October 2008, Keble College, Oxford, UK.
Fewtrell, T. and Bates, P. and de Wit, A. and Asselman, N. and Sayers, P. (2008) Comparison of varying complexity numerical models for the prediction of flood inundation in Greenwich, UK. In: FLOODrisk 2008, 30 September - 2 October 2008, Keble College, Oxford, UK.
Huthnance, J. and Lane, A. and Karunarathna, H. and Manning, A.J. and Reeve, D. and Norton, P. and Wright, A. and Soulsby, R.L. and Spearman, J. and Townend, I. and Surendran, S. (2008) Development of estuary morphology models. In: FLOODrisk 2008, 30 September - 2 October 2008, Keble College, Oxford, UK.
Mitchell, C. and Tarrant, O. and Denness, D. and Sayers, P. and Simm, J.D. and Bramley, M. (2008) Embedding new science into practice – lessons from the development and application of a Performance-based Asset Management System. In: FLOODrisk 2008, 30 September - 2 October 2008, Keble College, Oxford, UK.
Morris, M. and Allsop, W. and Buijs, F. and Kortenhaus, A. and Doorn, N. and Lesniewska, D. (2008) Failure modes and mechanisms for flood defence structures. In: FLOODrisk 2008, 30 September - 2 October 2008, Keble College, Oxford, UK.
Di Mauro, M. and Lumbroso, D. (2008) Hydrodynamic and loss of life modelling for the 1953 Canvey Island flood. In: FLOODrisk 2008, 30 September - 2 October 2008, Keble College, Oxford, UK.
Schanze, J. and Bakonyi, P. and Borga, M. and Gouldby, B.P. and Marchand, M. and Jiménez, J. and Sterr, H. (2008) Integrated methodologies for flood risk management practice in European pilot sites. In: FLOODrisk 2008, 30 September - 2 October 2008, Keble College, Oxford, UK.
Morris, M. and Hassan, M. and Kortenhaus, A. and Geisenhainer, G. and Visser, P.J. and Zhu, Y. (2008) Modelling breach initiation and growth. In: FLOODrisk 2008, 30 September - 2 October 2008, Keble College, Oxford, UK.
Hawkes, P. and Tozer, N.P. and Scott, A. and Flowerdew, J. and Mylne, K. and Horsburgh, K. (2008) Probabilistic coastal flood forecasting. In: FLOODrisk 2008, 30 September - 2 October 2008, Keble College, Oxford, UK.
Lhomme, J. and Sayers, P. and Gouldby, B.P. and Samuels, P.G. and Wills, M. and Mulet-Marti, J. (2008) Recent development and application of a rapid flood spreading method. In: FLOODrisk 2008, 30 September - 2 October 2008, Keble College, Oxford, UK.
van Gelder, P. and Buijs, F. and Horst, W. and Kanning, W. and Mai Van, C. and Rajabalinejad, M. and de Boer, E. and Gupta, S. and Shams, R. and van Erp, N. and Gouldby, B.P. and Kingston, G. and Sayers, P. and Willis, M. and Kortenhaus, A. and Lambrecht, H. (2008) Reliability analysis of flood defence structures and systems in Europe. In: FLOODrisk 2008, 30 September - 2 October 2008, Keble College, Oxford, UK.
Kingston, G. and Robinson, D. and Gouldby, B.P. and Pullen, T.A. (2008) Reliable prediction of wave overtopping volumes using Bayesian neural networks. In: FLOODrisk 2008, 30 September - 2 October 2008, Keble College, Oxford, UK.
Simm, J.D. and Gouldby, B.P. and Sayers, P. and Flikweert, J. and Wersching, S. and Bramley, M. (2008) Representing fragility of flood and coastal defences: Getting into the detail. In: FLOODrisk 2008, 30 September - 2 October 2008, Keble College, Oxford, UK.
Simm, J.D. (2008) Sea wall or sea front? Looking at engineering for Flood and Coastal Erosion Risk Management through different eyes. In: FLOODrisk 2008, 30 September - 2 October 2008, Keble College, Oxford, UK.
Phillips, T. and Hall, J.H. and Dawson, R.J. and Barr, S. and Ford, A. and Batty, M. and Dagoumas, A. and Sayers, P. (2008) Strategic appraisal of flood risk management options over extended timescales: combining scenario analysis with optimization. In: FLOODrisk 2008, 30 September - 2 October 2008, Keble College, Oxford, UK.
Gutierrez Andres, J. and Lhomme, J. and Weisgerber, A. and Cooper, A. and Gouldby, B.P. and Mulet-Marti, J. (2008) Testing and application of a practical new 2D hydrodynamic model. In: FLOODrisk 2008, 30 September - 2 October 2008, Keble College, Oxford, UK.
Buijs, F. and Sayers, P. and Hall, J.H. and van Gelder, P. (2008) Time-dependent reliability analysis of anchored sheet pile walls. In: FLOODrisk 2008, 30 September - 2 October 2008, Keble College, Oxford, UK.
Allsop, W. and Bruce, T. and Pullen, T.A. and van der Meer, J. (2008) Hazards from wave overtopping. In: FLOODrisk 2008, 30 September - 2 October 2008, Keble College, Oxford, UK.
Gouldby, B.P. and Kingston, G. (2008) Staged uncertainty and sensitivity analysis within flood risk analysis. In: FLOODrisk 2008, 30 September - 2 October 2008, Keble College, Oxford, UK.
Walmsley, N. and Penning-Rowsell, E. and Chatterton, J.B. and Hardy, K. (2008) Who benefits from flood management policies? In: FLOODrisk 2008, 30 September - 2 October 2008, Keble College, Oxford, UK.