Up a level |
Buijs, F. and Sayers, P. and Hall, J.H. and van Gelder, P. (2008) Time-dependent reliability analysis of anchored sheet pile walls. In: FLOODrisk 2008, 30 September - 2 October 2008, Keble College, Oxford, UK.
Buijs, F. and van Gelder, P. and Vrijling, J. and Vrouwenvelder, A. and Hall, J. and Sayers, P. and Wehrung, M. (2003) Application of Dutch reliability-based flood defence design in the UK. In: Safety and Reliability. Swets & Zeitlinger (Taylor and Francis), pp. 311-319. ISBN 90 5809 551 7
Flikweert, J. and Simm, J.D. (2009) Improving performance targets for flood defence assets. Journal of Flood Risk Management, 1 (4). pp. 201-212.
Gouldby, B.P. and Kingston, G. (2008) Staged uncertainty and sensitivity analysis within flood risk analysis. In: FLOODrisk 2008, 30 September - 2 October 2008, Keble College, Oxford, UK.
Kellagher, R. and Cesses, Y. and Di Mauro, M. and Gouldby, B.P. (2009) An urban drainage flood risk procedure - a comprehensive approach. In: WaPUG Annual Conference 2009, 11-13 November 2009, Hilton Hotel, Blackpool.
Lumbroso, D. and Ramsbottom, D. and Spaliviero, M. (2008) Sustainable flood risk management strategies to reduce rural communities’ vulnerability to flooding in Mozambique. Journal of Flood Risk Management, 1 (1). pp. 34-42.
McGahey, C. and Samuels, P.G. (2004) A practical approach to uncertainty in conveyance estimation. In: Annual Conference of River and Coastal Engineers 2004, June 2004, University of York, UK.
Mulet-Marti, J. and Underhill, C. and Gutierrez Andres, J. and Woolhouse, G. (2009) Intelligent meshing for two dimensional overland flow modelling; a comparison of two methodologies. In: International Conference on Urban Flood Management, 26-27 November 2009, Paris.
Phillips, T. and Hall, J.H. and Dawson, R.J. and Barr, S. and Ford, A. and Batty, M. and Dagoumas, A. and Sayers, P. (2008) Strategic appraisal of flood risk management options over extended timescales: combining scenario analysis with optimization. In: FLOODrisk 2008, 30 September - 2 October 2008, Keble College, Oxford, UK.
Samuels, P.G. and Bramley, M. and Evans, E.P. (2007) A new conveyance estimation system. In: Annual Conference of River and Coastal Engineers 2002, July 2002, University of Keele, UK.
Samuels, P.G. and Morris, M. and Sayers, P. and Creutin, J. and Kortenhaus, A. and Klijn, F. and Mosselman, E. and Van Os, A. and Schanze, J. (2008) Advances in flood risk management from the FLOODsite project. In: FLOODrisk 2008, 30 September - 2 October 2008, Keble College, Oxford, UK.
Sayers, P. and Hall, J. and Dawson, R.J. and Ohl, C. and Rosu, C. and Meadowcroft, I. (2003) Risk Assessment for Strategic Planning (RASP) – An intermediate and detailed level methodology. In: Defra Flood and Coastal Management Conference 2003, 16-18 July 2003, University of Keele, UK.
Sayers, P. and Meadowcroft, I. (2005) RASP - A hierarchy of risk-based methods and their application. In: Defra Flood and Coastal Management Conference 2005, 5 - 7 July 2005, York, UK.
Schanze, J. and Bakonyi, P. and Borga, M. and Gouldby, B.P. and Marchand, M. and Jiménez, J. and Sterr, H. (2008) Integrated methodologies for flood risk management practice in European pilot sites. In: FLOODrisk 2008, 30 September - 2 October 2008, Keble College, Oxford, UK.
Simm, J.D. and Gouldby, B.P. and Sayers, P. and Flikweert, J. and Wersching, S. and Bramley, M. (2008) Representing fragility of flood and coastal defences: Getting into the detail. In: FLOODrisk 2008, 30 September - 2 October 2008, Keble College, Oxford, UK.
Tagg, A. and Murphy, A. and Davison, M. and Goff, C. (2016) The use of smart infrastructure in dams to protect communities from flooding. In: CDA 2015 Annual Conference, 5-8 October 2015, Mississauga, Canada.
Tagg, A. and Proverbs, D. and Johnson, M. and Lamond, J. and Escarameia, M. and von Christierson, B. and Kidd, B. (2009) Drying flood damaged buildings. In: 44th Defra Flood and Coastal Management Conference, 30th June - 2nd July 2009, Telford, UK.
Udale-Clarke, H. (2005) Flood risk assessment guidance for new development - Phase 2 - Technical Report 1. Technical Report. Defra/EA.
Udale-Clarke, H. and Ramsbottom, D. and Dyer, B. and Wade, S. and Segura Dominguez, S. and Bain, V. and Davison, M. and Surendran, S. (2005) Flood risk assessment guidance for new development - Phase 2 - Technical report 2. Technical Report. Defra / EA.
Woodward, M. and Gouldby, B.P. and Kapelan, Z. and Khu, S. and Townend, I. (2010) The use of real options in optimum flood risk management decision making. In: 1st European IAHR Congress, 4 – 6 May 2010, Edinburgh, UK.